Using one button for both jog and continuous run relies on a composite button with linked NO and NC contacts. This page explains the one-button two-mode wiring.
A composite (double-contact) button has a NO and an NC contact mechanically linked: on press the NC opens first then NO closes; on release NO opens first then NC closes. This break-before-make timing lets one button do both: the NC in the latch branch cuts the latch, the NO in the start branch gives jog. Press and the coil energizes while the NC opens the latch, so on release the latch cannot catch and the motor stops, that is jog.
A more reliable single-button scheme adds a small selector switch SA: in jog position SA opens the latch branch so pressing SB jogs; in run position SA closes it so after SB the latch holds. Pure composite-button timing is sensitive to contact bounce and not advised for critical gear. After wiring, test both modes unloaded: jog stops on release, run holds on release.
| Part | Role | Note |
|---|---|---|
| Composite | NO jog / NC cut latch | timing sensitive |
| Selector SA | pick jog/run | more reliable |
| Jog pos | latch open | stops on release |
| Run pos | latch closed | holds |
| Verify | unloaded | both modes |
| Critical | not button only | add SA |
Single-button jog/run uses the linked contacts of a composite button or a selector switch. The button-only trick is timing sensitive; for important equipment add an SA. Either way test both modes unloaded after wiring.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Control follows GB/T 5226.1 with IEC 60204-1; buttons follow JIS C 4520. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.