Which motor starts first, which one follows, and who stops with whom are the questions coordinated control must answer. This page gives the design path: map the process sequence, define start and stop rules, then configure interlocks and protection in layers.
Design starts from the process, not from components. Classify each motor: lubrication and hydraulic pumps are prerequisite auxiliaries, spindle and feed are main machines, conveyors and exhaust fans are supporting equipment. Then answer three questions: which machine must start before which, and after what interval (oil pressure needs three to five seconds); which stops first (spindle before pump, lubrication must not drop first); and who must stop on a fault (a spindle overload must stop the feed too, while the pump may keep running). Draw the answers as a timing block diagram; the circuit design is merely translating that diagram into contact series and parallel logic. Wiring before the sequence is settled guarantees rework.
Start rules translate into hardware as: the upstream contactor normally-open auxiliary in series with the downstream start circuit, so KM2 cannot start until KM1 runs, with a timer bridging the gap when automatic linking is wanted. Stop rules translate as: the downstream contactor normally-open contact in parallel across the upstream stop button, so the pump cannot stop while the spindle runs. The emergency stop bypasses all of this, cutting every coil directly. A selector switch provides coordinated versus individual mode: coordinated mode routes through the interlock chain, individual mode shortens it for single-machine commissioning, and after commissioning the switch must return to coordinated, ideally sealed or labeled.
Protection comes in three layers: overload, each thermal relay contact in series with its own machine and the downstream machines; safety, guard switches and the e-stop wired into the master start-permit line; and feedback, contactor auxiliaries summed to lamps and PLC signals. Before commissioning, run fault drills: trip any thermal relay, press any e-stop, and confirm the stopping range matches process intent. Zone the drawing with one area per motor and cross-references for contacts borrowed across zones, so future tracing never gets lost.
| Design stage | Key decision | Circuit realization | Check method |
|---|---|---|---|
| Process mapping | Draw the start-stop sequence | Translate to contact logic | Narrate the flow |
| Start interlock | Who precedes whom | Upstream NO in downstream start path | Downstream button dead before upstream runs |
| Stop interlock | Who stops last | Downstream NO across upstream stop button | Upstream stop fails while downstream runs |
| Overload coordination | Fault stopping range | Thermal contacts in own and downstream paths | Simulate a trip and verify range |
| Safety interlock | Guards and e-stop | In series with master start permit | Any open blocks the whole line |
| Individual mode | Selector switch | Coordinated or individual | Return to coordinated after setup |
Walk this table row by row at design review. The soul of coordination is sequence and fault range: start and stop in order when healthy, stop exactly the right machines when faulty; when both match the process, the design is done.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Interlocking and control functions for multi-motor drives follow GB/T 5226.1; motor controlgear coordination refers to GB/T 14048.4. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.