Lights that go out after you leave and fans that keep running a few minutes after shutdown are both power-off delay applications. This page covers the standard wiring, setting ranges for lighting versus process duty, and the safety interlocks that must never be delayed.
The basic circuit uses a power-off-delay timer: pressing the button energizes the coil, the instantaneous contact picks up and latches the contactor; releasing the button starts the timing, and at the set time the timed-opening contact drops the contactor. Corridor lighting is the classic case, one to three minutes. Three rules matter: use a plain momentary button, put the timed-opening contact in series with the contactor coil, and let the timer contact switch only the coil, never the lighting main circuit. Power the timer from ahead of the contactor so that dropping the load does not interrupt the timing itself.
Fan overrun settings carry process weight: oven fans run five to ten minutes to purge stored heat, garage ventilation three to five minutes to clear stale air, kitchen extract ten to fifteen minutes to clear duct grease smoke. The rule is that bigger thermal mass and bigger volumes want longer delays, and err long rather than short. The stop button breaks the run latch and fires the timer at the same moment, and the timed-opening contact holds the contactor until the delay expires. One safety red line: on kitchen extract, the gas-alarm interlock must stop the fan immediately and must never be held through the delay path.
Commission with a short setting around thirty seconds to prove the logic, then set the process value and record a full-cycle measurement. Common faults: after the light goes out the button is dead, usually an unfinished timer reset, cured by a reset-confirmation contact or a two-second gap; the fan stops instantly on stop, meaning a timed-opening contact was wired from an instantaneous one, so check the contact numbering; a corridor lamp that never goes out points to a welded timed contact or a shorted button loop, verify with the power off. Presence sensors are replacing lighting timers, but process overrun still belongs to the timer approach.
| Application | Delay function | Typical setting | Key requirement |
|---|---|---|---|
| Corridor lighting | Lights off after leaving | 1~3min | Timer fed ahead of contactor |
| Oven exhaust fan | Purge stored heat | 5~10min | Set long, never short |
| Garage ventilation | Clear stale air | 3~5min | Separate from fire signals |
| Kitchen extract | Clear duct smoke | 10~15min | Alarm interlock bypasses delay |
| Warehouse lighting | Auto lights-off | 5~10min | Add reset confirmation |
| Machine coolant pump | Overrun after spindle stop | 1~3min | Lengthen if tool heat matters |
Decide first whether a delay is comfort duty or process duty. Comfort delays tolerate loose precision; process delays must be reliable first, and no alarm or safety interlock may ever be held through a delay path. That red line is not negotiable.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Control function and interlock design principles follow GB/T 5226.1; motor controlgear coordination refers to GB/T 14048.4. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.