Marking wires is not the end; the numbers are a long-term asset that must be maintained. Without a ledger the machine becomes a mystery after a few hands. Here is how to build and keep it.
A sound wire-number ledger holds at least: wire number, owning sheet, start and end (cabinet terminal or field device), device tag, cable number if multicore, conductor size, function description, revision and date. In Excel or an asset system, one wire per row. Any number then reverse-traces to drawing, device and physical wire, which is what repair and retrofit rely on. The ledger revises with the drawing; otherwise the next person reads stale data.
Maintain by update-on-change: any add, move or swap syncs ledger, drawing and field together. Assign an owner (equipment engineer or document clerk) and log every change (who, when, why). Before a new machine runs, do a full physical check (continuity) to lock the initial version. Back-filling an old machine, verify the field first then record; do not copy the old drawing, which may already be wrong.
| Element | Record | Need |
|---|---|---|
| Base | No/sheet/pos | Reverse |
| Link | Tag/cable | Map clear |
| Revision | Ver date | Sync |
| Change | Who when why | Log |
| Backfill | Verify field | Not old dwg |
| Owner | Named | Periodic |
Rule: ledger records number, sheet, ends, device tag, cable, size, function, revision and date, one wire per row for reverse trace. Update on change, name an owner, full physical check before run, verify field before back-filling, periodic review; the ledger is a long-term asset.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical documentation and asset management per GB/T 6988 series, item codes per GB/T 5094, equipment upkeep per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.