Bundle power cables with signal wires and the drive will scramble every reading. This page sets out the separation rules between main and control wiring and the suppression measures, from duct separation to screening, earthing and filtering.
Physical separation comes first, especially for drive outputs: inside cabinets run power and signals in separate ducts with 50mm spacing; in shared trenches or trays keep 300mm or fit metal dividers; in conduits never mix power and signal in one tube. Manage colour families too: black or phase colours for power, red for control, shielded twisted pairs for signals, yellow-green only for PE. The drawings must include tray and conduit routings with the spacing noted, so crews build and inspectors accept by the same picture.
Screening and earthing follow conventions. Analogue and encoder cables use shielded twisted pairs with the shield earthed at one end, floating at the source and bonded to PE at the receiver, or bonded both ends where high-frequency interference dominates and ground potential difference is small; never use the shield as a conductor and keep stripped ends under 10mm. Collect three earth families, protective, signal and shield, onto separate busbars that join the earthing network at one point, with resistance typically 4 ohms or better, ideally under 1 ohm for automation systems, and earth conductors at least half the supply cross-section and never below 4mm2.
Filter and lay out with the noise map in mind: line reactors and EMI filters on drive inputs, shielded motor cables, filters mounted close with large-surface PE bonding; shielded windings in control transformers and filtered isolation ahead of PLC supplies. Inside the cabinet put the drive and the PLC at opposite ends with contactors and terminals between them, and stack the 24V supply above the 220V control wiring, never beside it. Mark sensitive runs and screen-earth points on the drawing and check each one at commissioning.
| Measure | Practice | Requirement | Failure sign |
|---|---|---|---|
| Separate ducts | Power and signal apart | 50mm spacing minimum | Glitches and comms errors |
| Separate conduits | One tube per family | Never mixed | Signal jumps at starting |
| Single-end screen earth | Float source, earth receiver | Strips under 10mm | Analogue drift |
| Three-busbar earthing | PE, signal, shield apart | One-point network entry | Low-frequency ground loops |
| EMI filter | Close to the drive input | Large-surface PE bond | Conducted noise persists |
| Twisted pairs | Signal with return twisted | Even lay length | Induced voltage pickup |
Suppression is a system: draw separation, screening, earthing and filtering clearly, build by the drawing, and remember that fixing interference after commissioning costs tenfold. Diagnose in order: layout and spacing first, screening and earthing next, software filtering last.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: EMC installation per GB/T 17799.2 (IEC 61000-6-2); wiring and screening per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.