A machine electrical system without routine maintenance fails exactly when it is needed most. This page sets out daily inspection and maintenance points that keep downtime low.
Every shift before start-up check the cabinet for alarms and indicator states, listen for abnormal noise and burnt smell; during running watch motor current and temperature and whether contactors pull in steadily. Every week clean the cabinet dust filters and heat sinks, check terminals for looseness and heat discolouration and retighten. Every month test insulation of key motors and verify emergency stop and limits still work. Operators must stop and report on any anomaly instead of pushing through.
Quarterly dust contactors and relays, check contact burn and operating flexibility, lubricate moving mechanisms, and re-verify protection settings. Yearly do a full service: megger all circuits, verify thermal relays and breaker trips, tighten all busbars and terminals, check earth continuity, clean fans and ducts, and back up the PLC program. Keep consumables such as buttons, lamps and small relays in stock. After maintenance run no-load and loaded trials and record them.
Typical mistakes: repair only after failure with heavy downtime losses; dust filters never cleaned so blocked ducts overheat motors; loose terminals never retightened, heating and burning; E-stop and limits never verified so they fail when needed; PLC program never backed up so a failed controller means stopping production to reprogram. Do it right: keep a maintenance calendar, execute by the table, archive records, stock consumables, keep multiple backups. Make maintenance a system, not firefighting.
| Cycle | Item | Action |
|---|---|---|
| Per shift | Alarms noise | Stop on anomaly |
| Weekly | Clean tighten | Check heat |
| Monthly | Insulation E-stop | Verify |
| Quarterly | Dust lubricate | Check contacts |
| Yearly | Full service | Backup program |
Machine electrical maintenance works by scheduled inspection, not by repair after failure. Follow the five-level list of shift, week, month, quarter and year focusing on dust, terminals, insulation, safety and program backup; keep the calendar and records fixed so availability stays high.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Machine electrical safety see GB/T 5226.1 (IEC 60204-1), maintenance see relevant standards, low-voltage apparatus see GB/T 14048. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.