Every element on a machine is named by its component designation such as KM1 or M1. A messy scheme makes the drawing unreadable and fault finding a guessing game. Here are the rules to keep drawing and hardware in one to one correspondence.
A component designation follows a structured form: higher level code plus location plus class letter plus terminal. In daily use it shortens to class letter plus number, for example KM1 where K stands for the contactor or relay class and M for motor number one. The class letter comes from the function group per GB/T 5094, and the number runs sequential within the class. So the letter tells the type and the number tells which one, which makes locating fast.
Rules: same type elements share one prefix with continuous numbers; the designation is unique within the equipment with no duplicate; the designation matches the tag on the symbol and the physical nameplate; complex plants use higher level codes for systems such as =A and location codes for mount points; once set, the code goes into the parts list and revises on change. Keep a fixed letter table and never mix K with KM.
| Element | Rule | Example |
|---|---|---|
| Class letter | By function | K/M/F |
| Number | Sequential | KM1/KM2 |
| Unique | No dup in unit | No repeat |
| Higher | Split system | =A/=B |
| Location | Split mount | +C |
| Controlled | In parts list | Revise |
Rule: designation equals class letter plus number such as KM1; the letter by function group, number continuous and unique within class, matching drawing and nameplate. Use higher and location codes for complex plants and control the code in the parts list.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical item codes per GB/T 5094 (IEC 61346), symbols per GB/T 4728, documentation per GB/T 6988. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.