Drawings done but not archived with messy versions mean the original is lost after three years. This page covers how to classify, number and version-control electrical drawings.
Per GB/T 6988, drawings split into overviews (system), function, circuit (schematic), wiring, layout and terminal-strip drawings, each with a code (schematic 10, wiring 11, layout 12). Classification lets retrieval and maintenance locate at a glance. One device uses a common number prefix (e.g. EE-1501-) with a suffix per type, and drawings carry states new, modified, obsolete.
Three control elements: version (each change bumps A to B to C, with date and note in the title block), sign-off (designer, checker, approver sign, each accountable), archive (electronic folder per device, paper kept dry and fire-safe). Traps: changing without bumping version lets the site use the old wiring; un-recalled obsolete drawings let rookies build to them; electronic and paper disagree with no proof.
| Type | Code | Role |
|---|---|---|
| System | 01 | Energy |
| Schematic | 10 | Logic |
| Wiring | 11 | Links |
| Layout | 12 | Position |
| Terminal | 13 | Allocate |
Classify per GB/T 6988 with codes and a common number prefix; manage version (A to B to C), sign-off (three signatures) and archive (electronic equals paper). Ship a drawing list with the device, update within 7 days of any mod, and mark old versions obsolete.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Documents per GB/T 6988, symbols per GB/T 4728. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.