Electrical work without permits and systems turns small errors into major accidents. This article explains how to build and execute the safety operation permit and maintenance system for control circuits.
Switching and maintenance must use a written permit stating task, equipment number, steps (which level to open, verify, ground, barrier, tag), order and guardian. Execute with one operating and one guarding, ticking each item, never skipping. Both energising and de-energising follow the permit, with simulation before major operations. Archive permits for traceability and accident review. High-risk work also needs a work permit defining safety measures and authorisation.
Maintenance follows isolation, verify, discharge, tag and lockout (LOTO), and guardian. Before work measure insulation to confirm dead, mark disconnected wires and record for restoration. No live work unless specially approved with insulated protection. After work restore temporary changes, check wiring, measure insulation, jog-verify then load. Keep a planned maintenance schedule and defect ledger with closed loops. Hand over unclosed tasks clearly; never pass a shift with hidden dangers.
| Stage | Require | Red line |
|---|---|---|
| Permit | Clear steps | No skip |
| Guardian | Two men | No alone |
| Dead verify | Confirm dead | No live |
| Lockout | LOTO | No close |
| Restore | Jog load | No danger |
The safety permit and maintenance system: write steps for switching and maintenance, dual guardianship ticking each item, isolate verify discharge tag lockout, never live, jog-verify after restore, close defects and hand over clearly. Never operate by memory without permit, work alone, skip verify, fake lockout or load without verification; post the system on the wall and include it in assessment.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical safety see GB/T 5226.1 (IEC 60204-1) and GB/T 13869, lockout tagout see relevant standard (e.g. GB/T 33579), low-voltage distribution see GB 50054. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.