Sequential start enforces who may start first, delayed start enforces the interval between them; together they make a complete start sequence. This page shows how to merge the two with one timer, using an oil-pump-first machine circuit as the worked example.

1. How it works

The sequence constraint is hardware: the oil pump contactor auxiliary contact sits in series with the spindle start circuit, so no button press works before the pump runs. The delay is process: the pump needs three to five seconds to build oil pressure, so its contact fires a power-on-delay timer whose timed contact opens the spindle circuit allow-window. The two combine into one chain, pump start, timer runs, spindle circuit unlocks at the set time, then the operator or an auto contact closes in. The hard interlock guarantees safety, the delay guarantees process, and neither substitutes for the other.

2. Numbers and practice

In the worked circuit, KM1 latches and energizes KT1 set to five seconds; the timed contact sits in series ahead of the KM2 start branch, and once KM2 pulls in, its own holding contact bypasses the timer contact. That bypass is the key detail: the timer contact opens the door but never holds the load, so a failed timer cannot drop a running spindle. The emergency stop kills KM1, KM2 and the timer supply so everything resets. Stopping runs in reverse order, with a KM2 normally-closed contact inserted in the KM1 stop path so lubrication never goes first.

3. Pitfalls and fixes

Commission in three passes: prove the hard interlock by finding the spindle button dead before the pump starts; measure pump-start to spindle-unlock with a stopwatch and keep the error under ten percent; then simulate a timer failure by pulling KT1 during operation, the spindle must keep running and refuse a restart after shutdown.

4. Checklist for the combined sequence-plus-delay circuit

Check itemExpected stateFault symptomDirection
Spindle circuit before KM1Not energizedSpindle starts without pumpCheck KM1 auxiliary contact in series
Spindle start before KT1IneffectiveSpindle starts at once with pumpCheck timer timed-contact wiring
Spindle start after KT1EffectiveStill blocked at set timeMeasure voltage across KT contact
KT1 fails during runSpindle keeps runningSpindle drops with timerAdd holding bypass contact
Emergency stopAll stop, timer resetsWrong sequence on restartCut KT supply with e-stop
Stop orderSpindle first, pump lastPump stops first, lubrication lostKM2 NC contact in KM1 stop path

5. Notes

Walk this table row by row at commissioning. The structural rules are series for hard interlocks, timed contacts only open doors, holding contacts hold loads; with those duties separated, a dead timer stops nothing and an emergency stop always resets cleanly.

6. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Sequential starting and interlocking follow GB/T 5226.1; selection and testing of motor controlgear refer to GB/T 14048.4. Always check the device datasheet and the product design file for ratings and derating.

7. Cautions

⚠️ Three common pitfalls:
① Using the timer contact as the holding element: a timer fault or reset drops a running motor, jolting the load or overspeeding it
② Delay without the series interlock: a jumpered timer lets the spindle run dry before the pump starts and wrecks it
③ No stop-order interlock: the pump stops first, the spindle bearings run oil-starved and score within minutes

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.

Related reading

Related 3D models: Ready to build it? Download free 3D models & CAD drawings at MOULDL »
MOULDL · Electrical Knowledge Base · free self-study reference for electrical & automation engineers, 3D CAD models at MOULDL