Difference between equipment number and component designation

The equipment number (pump 1, fan 2) is the process or asset view; the component designation (KM1) is the electrical control view. They are not the same. Mix them and maintenance says equipment number while electrical says code, and they never meet. Here is the distinction.

1. How it works

Two views: the equipment number is an asset or process tag, assigned by process unit or asset ledger, such as P-101 pump or AHU-3 air unit, answering what the equipment does and which line it serves. The component designation is the element tag in the electrical drawing, KM1 contactor, M1 motor, answering which element in the loop. One equipment (P-101 pump) may hold many electrical components (KM1, M1, QF1), a one to many relation.

2. Practice and pitfalls

How to relate without confusion: in the asset ledger hang all electrical codes under each equipment number, so clicking the number pulls the list; note the owning equipment number in the schematic title or device box so the drawing shows which equipment it serves; in the PLC program use equipment number as process tag and code as hardware address, matched in comments; write both numbers on the work order so anyone understands; index both for cross system search. Manage the two separately and sync on rename.

3. Equipment number vs code table

DimensionEquipment noComponent code
ViewAsset processElectrical ctrl
ExampleP-101 pumpKM1/M1
StandardAsset mgmtGB/T 5094
RelationOne to manyHolds parts
MountUnder ledgerClick pulls
Work orderBoth writtenAll understand

4. Notes

Rule: equipment number (P-101 pump, AHU-3) is the asset process view, component code (KM1, M1) is the electrical control view, one equipment holds many components, one to many; hang codes under equipment in the ledger, double mark drawing and program, write both on work orders, sync on rename, and manage the two separately.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Item codes per GB/T 5094 (IEC 61346), asset management per equipment coding standards, symbols per GB/T 4728. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Use equipment number to find drawing part: not there
② Work order only code: asset system blind
③ Rename unsynced: equipment changed, electrical not

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.

Related reading

Related 3D models: Ready to build it? Download free 3D models & CAD drawings at MOULDL »
MOULDL · Electrical Knowledge Base · free self-study reference for electrical & automation engineers, 3D CAD models at MOULDL