Judging by eye when burnt contacts must be replaced easily goes wrong. This page gives the wear criteria and the right replacement timing so worn contacts are changed in time.
Healthy contacts have an even silver-alloy layer with slight pitting being acceptable. Scrap criteria: silver layer worn through showing base copper, thickness worn beyond one third of original, severe welding or melt craters over 2 mm across, or deep arc grooves on the face. Watch operation too: temperature rise above 60 K after pull-in, loud noise, slow release, or sticking after coil drop-out all point to contact or core trouble. Measure remaining thickness with a feeler gauge or caliper for accuracy.
Do not wait for total scrap: replace at one third wear or abnormal action to avoid welding in service causing shorts or motor phase loss. For frequently switched contactors, dozens of starts per hour, convert mechanical and electrical life into a replacement period and change early. Contactors of the same cabinet and duty reaching life together should be replaced in one batch to avoid staggered downtime. Replace with the same model and current rating, then measure pull-in voltage, three-phase synchronism and temperature rise.
Field mistakes: sanding blackened contacts and continuing use polishes away the silver layer and invites oxidation and welding; judging only by looks without measuring thickness finds wear too late; continuing with a stuck contactor risks a short at next start; wrong current rating, a smaller one, burns quickly. Do it right: apply the one-third and abnormal-action criteria together, measure with calipers, replace with the same model, test after fitting, and log operation counts to warn at the scheduled point.
| Criterion | Standard | Action |
|---|---|---|
| Silver layer | Worn to copper | Replace |
| Thickness | Beyond 1/3 | Replace |
| Crater | Over 2 mm | Replace |
| Temp rise | Above 60 K | Inspect |
| Welded | Not releasing | Replace now |
Judge contactor contacts by one-third wear, silver layer worn through, craters over 2 mm, abnormal temperature rise and welding; replace at the line, never patch. Same model, measure after fitting, and log operation counts so in-service welding with its shorts and downtime is avoided.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Low-voltage switchgear see GB/T 14048.5 (contactors), electrical safety see GB/T 5226.1, endurance testing see relevant standards. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.