A correct star-delta schematic is the premise of correct wiring. This article gives the standard drawing order from the main circuit through KM1, KM3 star point and KM2 bridge to the control circuit with KT and interlocks, noting GB/T 4728 symbols.
Start the main circuit from the three-phase supply L1L2L3: KM1 main contacts feed motor starts U1V1W1; KM3 contacts short U2V2W2 to a star point; KM2 contacts form the bridge linking U2-W1, V2-U1, W2-V1. Draw these three branches clearly with solid lines, the bridge exactly, as the base of the whole drawing.
Then draw the control circuit taking L1L2: SB1 stop, SB2 start, KM1 self-hold, then the KT coil (energized via KM1 NO) and its delayed changeover contact, NC in KM3 coil and NO in KM2 coil. Add the KM2/KM3 NC interlocks in series; lay the control out left-to-right, supply on top, load below, with clear interlock routing.
Mark every device with standard GB/T 4728 symbols; contactors, timers, buttons and thermals each have a prescribed form. Label terminals U1U2V1V2W1W2 correctly and distinguish multiple contacts of one device by letter. Put a title block and drawing number at top-right, add notes where complex, and self-check the bridge and interlocks before issuing the drawing.
| Step | Draw | Key | Easy error |
|---|---|---|---|
| 1 main power | L1L2L3 to KM1 | supply first | order reversed |
| 2 star point | KM3 shorts U2V2W2 | solid line | loose |
| 3 bridge | KM2 links U2W1 etc | three pairs | reversed |
| 4 ctrl power | take L1L2 | not L1L3 | cross |
| 5 KT interlock | delay contact plus NC | break-make | reversed |
| 6 labeling | GB/T 4728 sym | standard | missing |
Rule: main circuit in three layers (supply, KM1, star/bridge), control in five steps (start-stop, self-hold, KT, interlock, label). After drawing, check the bridge and interlocks line by line against the real device; a right drawing enables right wiring and saves rework.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Schematics per GB/T 4728, design per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.