What size to print, which sleeve to fit, whether to add a strip plate: small things until the print fades and tracing goes blind. This page covers sleeve selection, printing rules and strip plates.
Strip marking has three layers: terminal marker strips clipped on top of the block (ZDU-type, one cell per position), wire number sleeves printed and slipped over the conductors, and a strip plate naming the strip and its function. Buy marker strips matched to the block type; universal adhesive strips must match the width so the print stays fully visible. Letters of 2 mm or larger, readable at 0.5 m, count as qualified.
Print only with a heat-shrink or dedicated marker printer, never handwriting, whose ink fades within half a year. Choose heat-shrink sleeves (no slipping under strain) or semi-rigid PVC, letters facing outward in one uniform direction. Print three elements: wire number, destination device tag, and optionally the loop function (24V+). Keep font and format uniform per cabinet, e.g. always W101-3 style; light background with dark print reads even by torchlight deep in the cabinet.
| Layer | Form | Rule |
|---|---|---|
| Marker strip | On block top | Font ≥2 mm |
| Wire sleeve | Both wire ends | 5 mm from term |
| Strip plate | Laser engraved | Strip and function |
| Printing | Marker printer | No handwrite |
| Direction | Outward | Uniform |
| Spare holes | Pre-printed spare | No misuse |
Three marking layers: marker strips at 2 mm or larger, wire sleeves on both ends 5 mm from the terminal, and a laser-engraved strip plate naming the strip. Always machine-printed, uniform font and format, letters outward. Verify prints against the list before fitting, and cut off old sleeves when rewiring.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Terminal marking per GB/T 4026, documents per GB/T 6988. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.