When a multicore cable enters the cabinet, which cores land on which terminals must be marked on the drawing, or tracing is pure guesswork. This page shows how to draw and tabulate cable-terminal links.
A multicore cable (say 10-core control) splits into terminals; mark the cable number first then the core, e.g. core 3 of cable Y1 is Y1.3, and each hole on the strip shows cable.core to destination. Following the cable number reveals the whole core layout. Trap: marking only the terminal but not the core means swapping a cable forces a full re-trace.
The standard is two interlocked documents: a cable schedule (each cable, its cores, where each goes) and a terminal drawing (each terminal, which cable and core). Both share one cable and core numbering scheme and cross-reference. Complex jobs add a cable route drawing. Mark cable numbers as letters plus digits and cores as dot notation, and keep sleeve numbers identical for triple agreement.
| Item | Mark | Use |
|---|---|---|
| Cable | Y1/W2 | ID cable |
| Core | Y1.3 | ID core |
| Term | X1:5 | Physical |
| Schedule | Cross ref | Build |
| Route | Draw | Lay |
| Table | On door | Quick |
Tag multicore cables by cable.core to destination for traceability. Issue an interlocked cable schedule and terminal drawing sharing one numbering scheme, plus a route drawing for complex jobs. Update both on change with a red pen and a door table, and spot-check 10 percent of cores at acceptance.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical documentation per GB/T 6988, terminal marking per GB/T 4026, wire numbers per IEC 61175. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.