A latch loop has one more parallel latch wire and one more stop button than jog; one wrong step order makes it jog or unstoppable. This page gives the wiring order and the easy mistakes.
The order is the same as jog: mount parts, wire main loop, then control loop. Main: supply to breaker to KM main to motor, sized to current. Control: take control supply from one phase, through stop SB1 (NC) to start SB2 (NO) to KM coil to N; the key step is to parallel the KM NO auxiliary across SB2 as the latch. Finally wire the thermal relay NC in series for overload protection.
The latch wire is the KM NO auxiliary (usually 13-14 or 21-22) connected across the two terminals of SB2, forming a parallel with it. Note it is the auxiliary not the main contact, and the NO pair. After wiring, no-load test: press SB2 motor runs, release holds; press SB1 stops; press SB2 again runs, that is pass. Common faults: latch contact wired NC so it latches at power on; latch paralleled to wrong contactor so no self-hold here; stop wired NO so press to close, danger; missing thermal. Always verify by sound of the contactor before load.
| Step | Content | Point |
|---|---|---|
| Mount | parts on rail | mech then elec |
| Main | src to KM to motor | by current |
| Control | stop to start to coil | stop NC |
| Latch | KM aux par SB2 | NO |
| Thermal | NC in series | overload |
| Test | no-load check | hold on release |
Latch wiring: mount, then main, then control with stop NC in series and start NO to coil, parallel the KM NO auxiliary across the start button as the latch, and put thermal NC in series for overload. Faults are latch as NC, wrong contactor, stop reversed. Listen to the contactor no-load to confirm hold before load.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Low-voltage devices per GB/T 14048 with IEC 60947, safety GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.