Knowledge Base › Electrical Knowledge Base › Review checkpoints for main and control circuits on drawings
HomeModels
Table of contents

On this page

Electrical Control & Drawings (500 articles)

Quick Reference

Review checkpoints for main and control circuits on drawings

Drawing review is not a rubber stamp: main circuits are checked for capacity and protection, control circuits for logic and interlocks. This page lists the checkpoints for both sides so a review follows the list instead of the mood.

1. How it works

Review the main circuit on five points. Capacity: wire size and breaker settings match the motor current, verified by computing rated current against the device list. Protection: overload and short-circuit tiers complete, a thermal relay on every motor branch. Isolation: a maintenance isolator with visible break, control tapped downstream. Phasing: rotation and reversal swap points marked. Earthing: motor frames bonded to PE from the earth zone. Tick each point against its spot on the sheet.

2. Numbers and practice

Review the control circuit on six points. Supply: control voltage and transformer rating stated. Logic: start, hold-in and stop correct when simulated step by step. Interlocks: reversing contactors mutually locked, guard and e-stop chains in series with paired NC contacts. Contact duty: no contact carries more than its rating. Numbering: wire and terminal numbers match the terminal schedule. Signalling: lamps reflect true states. Write every contradiction into the review minutes.

3. Pitfalls and fixes

Run the review in three stages: self-review by the designer with the checklist, cross-review by a second engineer focused on logic simulation, and final approval by the supervisor. Grade the findings: class A logic errors force a redraw, class B missing annotations get a deadline, class C suggestions are optional. After revision, re-review and close each finding one by one; only a fully closed set becomes the construction issue, and the minutes become the baseline for future changes.

4. Drawing review checkpoint list

ObjectCheckpointMethodPass criterion
Main capacityWires match settingsCompute rated current1.2x margin on devices
Protection tiersOverload and short completePer-branch checkThermal relay per motor
Control logicStart and stop correctSimulate the sequenceMatches the process
InterlocksReversal and e-stop in placeCheck paired NC contactsCannot be bypassed
NumberingWire list consistencySpot check ten pointsDrawing, hardware, table agree
Review closureFindings clearedMinutes item by itemClass A and B all closed

5. Notes

Turn the checklist into a template so review quality stops depending on personal experience. Feed typical errors into a company mistake library and read it before new designs; the same errors stop repeating and reviews get faster with use.

6. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Review requirements per the design verification clauses of GB/T 5226.1; drawing quality per GB/T 6988.1. Always check the device datasheet and the product design file for ratings and derating.

7. Cautions

⚠️ Three common pitfalls:
① Reviewing lines without simulating logic lets missing interlocks reach construction and disable guard functions
② Leaving review findings unclosed ships class A errors to the site and doubles rework cost
③ Ignoring contact ratings puts main-circuit loads on auxiliary contacts, which weld and lose control

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.