The math of star-delta reduced voltage decides what load it can drive. Using a 37 kW motor, this article steps through the star starting current, delta current and torque drop, putting the 0.577 voltage and 1/3 current-torque relations into concrete numbers.
For a 37 kW 380 V motor, rated current Ie is about 2P = 74 A. A direct delta start draws about 6 to 7 times Ie, say 6.5 times or roughly 480 A, with starting torque about 2 times rated (locked-rotor). That is the hard-start level without any reduction, large in both grid and mechanical shock, exactly what star-delta avoids.
In star connection each winding sees only 0.577 of line voltage, phase current drops to 0.577 Ie or about 43 A, and since line current equals phase current it is also 43 A, about one third of the 480 A direct start. Formula I_Y is about I_Δ/3, so star-delta cuts the start current from about 480 A to about 43 A, greatly easing grid shock and is why it is cheap and handy.
Starting torque falls with the square of voltage, so at 0.577 voltage torque drops to 0.577 squared or about 0.333, i.e. one third of direct-start torque. With locked-rotor torque 2 times rated, star starting torque is only about 0.67 times rated, fitting light or no load only. Formula T_Y is about T_Δ/3; heavy loads will not accelerate on star-delta.
| Parameter | Direct | Star-delta | Drop |
|---|---|---|---|
| Phase volts | 1.0 Ue | 0.577 Ue | x0.577 |
| Line start | ~480A (6.5Ie) | ~43A | ~1/3 |
| Start torque | ~2x rated | ~0.67x rated | ~1/3 |
| Fits | heavy hard | light no-load | |
| Switch point | - | current min | |
| Verdict | big shock | smooth |
Rule: remember voltage 0.577, current 1/3, torque 1/3 together. First compute Ie, then check whether load torque is below 0.33 of locked-rotor; only then dare use star-delta, heavy loads go to soft starter or auto-transformer.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Sizing per IEC 60909, safety per IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.