The first on-site integrated run after installation is the most accident-prone stage. Without following commissioning rules, a machine may crash or injure people. This article explains the precautions and procedure for commissioning control circuits at the equipment site.
Before commissioning, inspect for transport damage, verify the equipment matches the drawing version, re-check all wiring, and tighten terminals. Disconnect the load, measure insulation of main and control circuits, confirm supply phase sequence and voltage match the nameplate, and check protective-earth continuity and resistance. Ensure emergency stop, limit switches, safety gates and protection settings are correct. Post warnings, assign a guardian, prepare temporary fusing, and never close the main switch with load attached.
Follow a stepwise procedure: first energise control power to verify relay and contactor logic and points, then energise main power and jog to check rotation and noise, then run briefly and finally load. VFD units need motor-parameter autotuning first. Observe current, temperature and smell at each step and open the switch on any anomaly. Test run by process sequence station by station, recording timings and parameters against design.
| Stage | Action | Note |
|---|---|---|
| Prepare | Verify insulate | Earth test |
| Control | Check logic | First |
| Main | Jog rotate | After |
| Interlock | By station | Record |
| Close | Restore tag | Log |
On-site commissioning is the most dangerous stage before operation. Core rules: verify drawing and insulation, energise stepwise control before main, jog to confirm rotation, assign guardian, and close the loop after debugging. Never skip verification, insulation or load isolation.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical safety see GB/T 5226.1 (IEC 60204-1) and GB/T 13869, commissioning see relevant code, low-voltage apparatus see GB/T 14048 series. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.