Precautions for On-site Commissioning of Control Circuits

The first on-site integrated run after installation is the most accident-prone stage. Without following commissioning rules, a machine may crash or injure people. This article explains the precautions and procedure for commissioning control circuits at the equipment site.

1. How it works

Before commissioning, inspect for transport damage, verify the equipment matches the drawing version, re-check all wiring, and tighten terminals. Disconnect the load, measure insulation of main and control circuits, confirm supply phase sequence and voltage match the nameplate, and check protective-earth continuity and resistance. Ensure emergency stop, limit switches, safety gates and protection settings are correct. Post warnings, assign a guardian, prepare temporary fusing, and never close the main switch with load attached.

2. Practice and pitfalls

Follow a stepwise procedure: first energise control power to verify relay and contactor logic and points, then energise main power and jog to check rotation and noise, then run briefly and finally load. VFD units need motor-parameter autotuning first. Observe current, temperature and smell at each step and open the switch on any anomaly. Test run by process sequence station by station, recording timings and parameters against design.

3. On-site Commissioning Checklist

StageActionNote
PrepareVerify insulateEarth test
ControlCheck logicFirst
MainJog rotateAfter
InterlockBy stationRecord
CloseRestore tagLog

4. Notes

On-site commissioning is the most dangerous stage before operation. Core rules: verify drawing and insulation, energise stepwise control before main, jog to confirm rotation, assign guardian, and close the loop after debugging. Never skip verification, insulation or load isolation.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical safety see GB/T 5226.1 (IEC 60204-1) and GB/T 13869, commissioning see relevant code, low-voltage apparatus see GB/T 14048 series. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Close main without test: wrong phase explodes
② Energise without insulation: damp shorts
③ Send main with load: motor jerks person

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.