A set of dozens of sheets without an index and numbering rules is a stew. This page covers numbering structure, index arrangement and version control so a drawing set flips like a book.
Use a segmented number: project-discipline-type-serial-version, such as E-EL-SYS-001-A, where E is the project, EL the electrical discipline, SYS the drawing type and A the version. Standardise type codes: SYS system, WIR schematic, TER terminals, LAY layout, INS installation. Publish the rule at project start, explain the codes on the first sheet, and any outsider can read the family from the number alone.
Arrange the index in reading order: cover, contents, system diagrams, schematic volumes, wiring diagrams, terminal schedules, layouts, installation drawings, change records. The index lists number, title, version, page count and revision date. For big projects split into volumes per machine or area, each volume carrying its own index, all tied by a master index. New sheets take numbers by rule and slot in, instead of piling at the end.
Version control rests on three rules: versions advance by letter, A first issue, B first revision, with every upgrade noted in the title block; superseded sheets are stamped void or collected so only one effective version exists on site; and a change record page logs each revision with content and affected sheets. Keep electronic and paper in step, file names matching drawing numbers, so the cabinet and the server never disagree.
| Item | Rule | Example | Purpose |
|---|---|---|---|
| Number segments | Project-discipline-type-serial-version | E-EL-WIR-003-B | Self-explaining |
| Type codes | Standardised code table | SYS WIR TER LAY | Family at a glance |
| Versions | Letter progression | A, B, C | One effective version |
| Index order | Reading order | System first | Smooth browsing |
| Volumes | Per machine or area | Each with index | Big sets split |
| Change record | Upgrade notes | Affected sheets logged | Changes visible |
Numbering and indexing are the infrastructure of a drawing set; fix the rules at kickoff and even dozens of sheets stay tidy. The drawing administrator registers every issue, retires void sheets on the spot, and the credibility of the set survives year after year.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Documentation and numbering per GB/T 6988.1; project and document codes per GB/T 5094 series (IEC 81346). Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.