Two motors form the smallest coordination unit with a clear master-slave relation. This page wires the classic case, M1 first to start and last to stop, M2 the reverse, section by section, with a powered test procedure that proves the logic in one pass.
Keep the main circuits independent: QF1, KM1, FR1 feed M1; QF2, KM2, FR2 feed M2, each sized to its own nameplate. All the coordination lives in the control circuit, which makes single-machine testing easy by opening the interlock. Separate supplies per machine are preferable, since a shared breaker means a full-line outage to service either motor. Confirm rotation direction by jogging each motor after wiring; never assume the same supply means the same direction.
Three control sections: the M1 branch runs stop button SB1 (NC), FR1 NC, start SB2 (NO), KM1 latch, KM1 coil; the M2 branch runs SB3 (NC), FR2 NC, then the KM1 NO interlock contact, start SB4, KM2 latch, KM2 coil, so M2 cannot start until M1 runs; the stop coordination adds a KM2 NO auxiliary contact in parallel across SB1, so M1 cannot stop while M2 runs and the pump always stops last. The emergency stop SB5, normally-closed, sits in the common supply head of both branches and kills everything instantly, immune to any interlock.
Prove it in five powered steps: dry operation, SB2 picks and latches KM1, SB4 picks KM2, pressing SB1 with KM2 held changes nothing, releasing KM2 first then frees SB1 to stop KM1; interlock proof, SB4 does nothing before KM1 runs; overload drill, actuate FR2 and watch KM2 drop, then confirm whether KM1 follows per process intent; emergency stop, SB5 releases both at once; finally a loaded run checking balanced currents on both motors. Archive the five-step record with the panel before handing over to operations.
| Element | Position | Contact type | Function |
|---|---|---|---|
| KM1 NO contact | In series with M2 start | NO auxiliary | M2 blocked until M1 runs |
| KM2 NO contact | Across M1 stop button | NO auxiliary | M1 held while M2 runs |
| FR1 NC contact | In M1 branch | NC | M1 overload stops M1 |
| FR2 NC contact | In M2 branch | NC | M2 overload stops M2, coordinated as needed |
| SB5 e-stop | Common supply head | NC | Immediate full stop |
| Indication lamps | Across KM1 KM2 NO | Following contactors | Run status display |
Check wiring and acceptance against this table. The mnemonic: the upstream NO locks the downstream start, the downstream NO holds the upstream from stopping early; match every contact against that sentence and the direction cannot go wrong.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Control interlock functions follow GB/T 5226.1; contactor and thermal relay selection refers to GB/T 14048.4. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.