The terminal-strip drawing is not drawn at random; list first, place holes, then mark numbers. Wrong order means rework. This page gives the standard method and sequence.
The sequence is: first the component list to fix which wires and loops connect; then place terminals in a row on the drawing, separating strong and weak zones; then mark each hole with its terminal number, component code and wire number; last draw jumpers and earth marks. Do not reverse it. Use EPLAN or CAD with separate layers for holes, numbers and bridges. Trap: drawing without a list then finding the loop count wrong halfway.
Draw a front developed view: terminals in a row, number below each hole and wire number above. Double-level terminals use A/B and offset. Jumpers are thick lines joining bridged holes with spec noted. Earth terminals sit at the ends marked PE. The border notes model, rail and total holes. Keep 1 to 2 mm gaps and uniform number direction toward the reader.
| Step | Content | Output |
|---|---|---|
| 1 List | Loops and wires | Wire list |
| 2 Place | Zone order | Hole layout |
| 3 Mark | Number wire | Number layer |
| 4 Bridge | Jump earth | Bridge layer |
| 5 Link | Three match | Checklist |
| 6 Verify | Hole vs real | Archive |
Draw in the order list, place, mark, bridge, link and verify; separate zones and uniform number direction. Keep the strip drawing, wiring and schematic numbers in agreement, checking wire ends and terminal destinations. Provide a spare-hole list and verify hole by hole against the real strip before archiving.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical documentation per GB/T 6988, terminal marking per GB/T 4026, terminals per IEC 60947-7-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.