After repair, wrong order in testing or energising invites accidents. This page explains the test items and the correct energising sequence so the motor starts safely.
Before energising test three items: motor winding insulation to earth and between phases (megger chosen by motor voltage, at least 1 M ohm), cable and contactor main contact insulation to earth, and control transformer secondary and control circuit insulation to earth. Also test main circuit phase-to-phase resistance with the load disconnected. For drive-fed motors separate the drive and motor: megger the motor at high voltage, test the drive side at low voltage or disconnect it. Discharge before and after every test and restore connections; record voltage and values for traceability.
The sequence: close the incoming isolator or main switch first, then feed control power and verify logic and relay actions, then enable the control circuit, and finally feed the main circuit and jog the motor to confirm rotation before loading. Pause and observe between steps, stopping at any anomaly. De-energising reverses: main circuit first, then control, then the incoming switch. Never pull the main switch under load or start and stop the motor with it. Both directions follow the operation permit with a guardian.
Field mistakes: feeding everything at once puts the whole cabinet live at a short; feeding main power with the load attached makes the motor lurch and damage things; meggering drive and motor together at 500 V destroys drive modules; not checking phase sequence reverses the motor into the load. Do it right: test all three insulation items, control before main, jog to confirm rotation, follow the permit. Archive the data, post the sequence on the cabinet, and every operator acts the same way.
| Action | Order | Note |
|---|---|---|
| Insulation | Motor cable control | Drive separate |
| Main switch | Incoming first | Check voltage |
| Control | Second | Verify logic |
| Main feed | Last | Jog rotation |
| De-energise | Reverse order | Permit |
Motor control circuit testing and energising is standard work: three insulation items, control before main, jog to confirm rotation, operation permit both ways. Never feed everything at once, never megger the drive with the motor, and check phase sequence or the motor reverses into the load.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Motor insulation see GB/T 1032 and GB/T 755, electrical safety see GB/T 5226.1 and GB/T 13869. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.