Star-delta wiring most often fails at the six winding terminals and the cross-connect bridge. This article gives the U1U2V1V2W1W2 layout, the KM2 bridge, and the rule of taking control power from L1L2.
Six wires in the terminal box are marked U1U2, V1V2, W1W2; U1V1W1 are starts to supply, U2V2W2 are ends. In star start U2V2W2 tie to a star point; in delta U2 to W1, V2 to U1, W2 to V1 close the loop. One wrong terminal reverses the motor or loses a phase, so buzz out each group before wiring.
KM1 feeds three-phase to U1V1W1. KM3 (star) ties U2V2W2. KM2 (delta) bridges U2-W1, V2-U1, W2-V1. KM2 and KM3 share the six terminals but do opposite jobs, so draw the bridge exactly or you short at switch.
Take 220V control from L1L2, never L1L3 which crosses phases. Match KT and KM coil voltage to control. SB2 start, SB1 stop, KM1 self-hold parallel to SB2, with under-voltage protection on restore.
| Terminal | Star start | Delta run |
|---|---|---|
| U1 V1 W1 | to KM1 out | to KM1 out |
| U2 V2 W2 | KM3 star point | bridge to W1 U1 V1 |
| KM2 contacts | open | bridge U2-W1 V2-U1 W2-V1 |
| KM3 contacts | short U2V2W2 | open |
| phase | L1 L2 L3 | L1 L2 L3 |
| ctrl power | L1L2 220V | L1L2 220V |
After wiring, no power: meter on KM2 closed shows U1-U2 conducting (delta loop); KM3 closed shows U2V2W2 conducting (star point). No continuity means a wrong terminal, confirm bridge before energizing.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Wiring and marking see GB/T 4728 symbols, safety per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.