Time relays delay their contact action after the coil energises or de-energises, shown by an arc mark on the contact. This page explains the difference between on-delay and off-delay symbols and the marking conventions that keep the timing logic readable.
The coil is the usual rectangle, but every delayed contact carries an arc with an arrow beside the contact symbol. An on-delay contact delays after the coil energises; an off-delay contact delays after the coil de-energises, and its arc points the opposite way. The arc direction is the key identifier, and reversing it inverts the timing logic completely. In a star-delta starter the changeover depends on this delay, so a wrongly drawn delay type can close two contactors in together.
Spell out the action direction on the drawing: on-delay NO closes after pick-up, on-delay NC opens after pick-up, off-delay contacts start timing on drop-out. Instantaneous contacts carry no arc and behave like a plain relay contact. Mark the delay range, for example 0.1 to 10 seconds, and the setting accuracy so the commissioning engineer has a reference when turning the dial.
| Type | Graphic mark | Timing moment | Typical application |
|---|---|---|---|
| On-delay close | arc toward closing | closes after pick-up | star-delta changeover |
| On-delay open | arc toward opening | opens after pick-up | delayed valve shut-off |
| Off-delay close | reverse arc | closes after drop-out | door delay |
| Off-delay open | reverse arc | opens after drop-out | cooling delay |
| Instantaneous | no arc | acts at once | instant interlock |
The arc direction defines the whole timing logic; swapping on-delay and off-delay can produce a phase-to-phase short during star-delta changeover. Instantaneous contacts carry no arc, and every setting value belongs on the commissioning sheet together with its direction.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Time relay symbols per GB/T 4728.7; sequencing design per GB/T 5226.1 and IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.