Reading the common symbols on lift electrical drawings

Lift drawings carry many symbols plus a few trade-specific ones, and misreading them risks wrong operations. This page explains the common and specific symbols in lift drawings and how to read them safely.

1. How it works

Most lift symbols concentrate on the safety chain: governor switch, safety gear switch, upper and lower limit switches, landing and car door interlocks, buffer switch. Each is an ordinary switch symbol in GB/T 4728, but they are wired in series as one safety chain where any open contact stops the lift. Alongside them are the brake coil (YB), the rotary encoder symbol, the load-weighing sensor and the light curtain. Lift symbols follow GB/T 4728 while the safety logic follows GB 7588, so start reading by finding that chain of NC contacts.

2. Practice and pitfalls

Drive and control come next: the drive is a VFD box plus a motor circle with M, the door operator is a motor plus limits, call buttons are SB, position indicators are HL. Group control logic lives in a PLC or dedicated board drawn as a box labelled control cabinet. A lift drawing splits into three blocks, power transmission, safety circuit and call control; the symbols are the same as any machine tool drawing, only the logic differs, so when lost, split the sheet into the three blocks first.

3. Common lift drawing symbol table

SymbolNameLocationKey point
NC chainsafety chain switchessafety circuitany open stops all
YBbrake coiltraction machinevoltage marked
Encoder symbolrotary encodermotor shaftcheck pulses
Light curtaindoor protectioncar doorthrough-beam
SBcall buttonlandingup and down calls

4. Notes

Lift symbols follow GB/T 4728, but the safety chain of NC switches is the core: any single open contact stops the lift. Brake coil, encoder and light curtain have their own drawings, so split the sheet into power, safety and call blocks, and maintenance always verifies the safety chain devices against the drawing first.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Lift symbols per GB/T 4728; safety requirements per GB 7588 and the EN 81 series. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Landing door interlock treated as an ordinary limit: nobody realises one open contact stops the whole lift
② Brake coil wired at the wrong voltage: burnt coil or a brake that cannot hold
③ Encoder symbol not recognised: pulse-loss faults cannot be traced

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.