Where in the cabinet is the contact that the schematic shows as KM1? Verifying the correspondence between drawings and hardware is the last defence against miswiring. This page gives the pairing rules, a three-step checking flow and record keeping.
A coil and all its contacts belong to one family: the coil, main contacts and auxiliary contacts of KM1 live in the same contactor although the drawing scatters them, reunited only by the tag. Check pairing on two layers. On paper, list the coil and every contact of each tag and count NO and NC sets against the fitted auxiliary blocks, because one missing set breaks the logic. In hardware, the tag on the drawing, the nameplate in the cabinet and the terminal marker must all say the same thing.
Run the field check in three steps. First, produce a device list from the schematic with tags, models and locations. Second, find each device in the cabinet per the layout drawing and verify model and tag plate. Third, verify wiring: check the wire number on every terminal of each device against the terminal diagram, and continuity-test key loops with a meter. Sign each line of the list, one checker plus one reviewer, double signatures required; any mismatch gets a temporary label on the spot and a correction back on the drawing.
Record everything on a six-column sheet: tag, drawing page, terminal number, physical location, result and checker. Log leftovers on a punch list with owners and deadlines and clear them on re-inspection. New machines get full coverage before first energisation; retrofits check the changed loops with spot checks on neighbours. Budget 0.5 to 1 hour per cabinet, which looks slow until you compare it with a shift lost hunting one short circuit after power-on.
| Check item | On drawing | On hardware | Pass criterion |
|---|---|---|---|
| Coil tag | Control loop zone | Contactor nameplate and tag | Tags identical |
| Main contact wiring | Main terminal numbers | Wire numbers at contactor input | Match the drawing |
| Auxiliary contacts | Hold-in and interlock runs | Auxiliary contact blocks | Enough NO and NC sets |
| Terminal markers | Terminal diagram | Markers on the block | Wire numbers match both sides |
| Coil voltage | Bill of materials | Nameplate voltage | Equals drawing voltage |
| Double sign-off | Check record sheet | Two signatures | Record complete |
Correspondence checking aligns three nets, drawing, hardware and wiring; any misalignment is a latent fault. Turn the checklist into a standing template for acceptance and post-overhaul return to service; checking hours are always cheaper than emergency repairs.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Device marking and verification per GB/T 5226.1; terminal identification per GB/T 4026. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.