How many wires to pull and how to lay the terminal strip directly decides material cost and miswire rate. This note gives the minimum-wire formula for n stations and the terminal layout rules, so wiring saves cable and avoids errors.
Two-station control needs only 3 control wires: common, start, stop. Each extra station just taps the running mains; no new wires per box. In practice n stations use three through wires: one common, one start bus, one stop chain, with all boxes tapped on. The box-to-motor power is separate, usually 3 phase plus PE, four wires.
Zone the terminal strip by function: supply, stop chain, start, coil, motor power. Number both ends of every wire identically, such as 1 common, 2 start, 3 stop. Use through terminals to series the stops and parallel terminals to parallel the starts. Keep 15 percent spare terminals, spring washers on screws, tinned or pinned wire ends. Test insulation above 1 megohm before energising.
| Item | Two | Three | n |
|---|---|---|---|
| Min control | 3 | 3 | 3 through |
| Power | 3+PE | 3+PE | 3+PE |
| Zones | 5 | 5 | 5 |
| Spare | 15% | 15% | 15% |
| Tap | Parallel | Parallel | Parallel |
| Insulation | ≥1M | ≥1M | ≥1M |
Wires and terminals are the foundation of multi-point reliability. Keep three through wires, parallel-tap terminals, consistent numbers, and insulation up to standard, and later troubleshooting takes ten minutes instead of tearing the box apart.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Wiring and insulation in GB/T 5226.1 chapter 13; IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.