Drawing transformers and instrument transformers: symbol essentials

A transformer is two coupled circles, and instrument transformers are its special forms. This page explains how power transformers, current transformers and voltage transformers are drawn and how ratios are annotated.

1. How it works

A power transformer (T) is two adjacent circles, one per winding, with primary voltage such as 10kV and secondary 400V written beside them. Three-phase units use a group of three winding symbols; on-load tap changers add a small arrow; the core is a vertical line through the circles. The vector group such as Dyn11 must be stated, otherwise phase relationships are lost and paralleling becomes impossible.

2. Practice and pitfalls

A current transformer TA is a single circle pierced by a thick line representing the primary conductor; its secondary feeds ammeters and must never be opened. A voltage transformer TV looks like a normal two-circle transformer; its secondary feeds voltmeters and must never be shorted. Both reduce values for measurement, so mark the secondary earth point and the ratio: CT 100/5A, PT 10kV/100V. Leaving the CT secondary drawable as an open circuit is a serious latent hazard.

3. Transformer and instrument transformer symbol table

DeviceSymbolLetter codeMarking points
Single-phase transformertwo circlesTmark primary and secondary voltage
Three-phase transformerthree winding groupTmark vector group
Current transformercircle plus thick pierce lineTAratio, never open
Voltage transformertwo circlesTVratio, never short
Autotransformerone circle plus tapTmark tap voltage

4. Notes

Two circles mean a transformer; instrument transformers are special forms where the CT secondary must never open and the PT secondary must never short, with the earth point drawn explicitly. Ratios and vector groups belong on the drawing, since wrong ratios wreck metering and wrong vector groups wreck phase logic.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Transformer symbols per GB/T 4728.6; ratings per GB/T 1094, GB/T 1208 and related IEC standards. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① CT secondary drawn as openable: opening it under load generates lethal high voltage
② PT secondary earth not marked: protection is lost and a short burns the winding
③ Ratio annotated wrongly: meter readings are out by the ratio factor

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.