Interlock control is a frequent exam and site topic; the Q and A form quickly clarifies mistakes. This article explains interlock principle, wiring and confusing concepts in question form for review and teaching.
Q: What is the difference between interlock and self-latch? A: Self-latch parallels own NO to hold, interlock series opponent NC to prevent simultaneous pull-in; one holds, one excludes. Q: Why must the interlock contact be NC? A: NC conducts when de-energized and opens when picked up, cutting the opponent on its energize; NO would close on energize and fail. Q: Can we use only button or only contactor interlock? A: Neither alone is reliable; use dual interlock.
Q: What are the common interlock wiring mistakes? A: NC as NO, omitted, or parallel instead of series. Q: Why wire main before control? A: Main carries large current and high risk, and control depends on main phase. Q: What does pressing both buttons prove? A: It is the destructive test of interlock; both must not pick up to pass. Q: Can PLC interlock replace hardware? A: No, keep mechanical or hard-wired interlock as defense.
Q: How to find both closing together? A: Check interlock NC or omission, then weld and low voltage. Q: Why intermittent? A: Oxidation, loose wire or interference; measure resistance, tighten, separate wiring. Q: Interlock lost after retrofit? A: Verify both program and hardware interlock remain; do not delete the hardware line. These cover the main pitfalls; practice with real hardware.
| Question | Point | Mistake |
|---|---|---|
| Latch vs interlock | Parallel series | Reversed |
| Contact type | Must be NC | NO fails |
| Dual interlock | Button plus contactor | Single missed |
| Both-button test | Neither picks | Not done |
| PLC interlock | No hardware | Delete defense |
Interlock Q and A revolve around three mistake areas: confusing self-latch with interlock, using NO instead of NC, single-level unreliability, mandatory both-button test, and PLC not replacing hardware. Practice with real hardware to turn concepts into hands-on skill.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Low-voltage switchgear per GB 14048.4, machinery safety per GB/T 5226.1, referencing IEC 60947 and IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.