An under-annotated drawing is half a product: coil voltages missing, wire numbers gapped, references dangling. This page sets out the completeness and consistency checks that gate a drawing set before delivery.
Check completeness on six classes: device marking, every symbol carrying tag and model; parameter marking, coil voltages, thermal settings, KT delays, fuse ratings; wire numbers on every run with matching break points; terminal numbers on all cross-cabinet runs; references, page and zone numbers on cross-page contacts; and notes for special practices such as screen earthing. List each class on a sheet and sweep them one by one, never by impression.
Check consistency on three alignments. Within a sheet, one device keeps one spelling, KM1 never becoming KM-1 or KMI. Across sheets, schematic, terminal diagram and layout agree on tags and wire numbers. Between drawing and tables, the bill of materials and wire list carry the same data as the drawing. Sample to check: pick five devices, five wires and five terminals, and require all three places to agree; any failure sends the whole sheet back for a full sweep.
Fill gaps by process: missing parameters recovered from device datasheets and contracts, missing references recovered by walking the logic chain, every addition logged as a revision. Before delivery run the final gate: six completeness classes green, consistency sampling passed, print preview readable, version matching the technical agreement. Make the annotation checklist a standing step of the issue process, designer self-check plus reviewer sampling, and after three months the miss rate drops to near zero.
| Class | Content | Method | Pass standard |
|---|---|---|---|
| Device marking | Tags and models | Sweep every symbol | No anonymous symbols |
| Parameters | Voltages and settings | Check key devices | Buildable data |
| Wire numbers | Numbering and breaks | Follow each run | No unnumbered wires |
| Terminals | Cross-cabinet numbers | Against schedule | One to one |
| References | Page and zone | Sample five chains | Chains read through |
| Consistency | Three sheets one table | Sample five devices | Data fully agree |
Annotation completeness is the quality bar for issue; short markings turn into questions and stoppages at construction and maintenance. Fix the checklist into the issue workflow with self-check and sampling, and after three months the reputation of the drawing set changes for good.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Annotation completeness per GB/T 6988.1; marking symbols and codes per GB/T 4728 and GB/T 7159. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.