An undersized control transformer sags when several contactors pick up together and the coils fail to close. This page covers the sizing method: pickup VA versus holding VA, the simultaneity factor, and the voltage-drop check, with a worked example that lands the transformer rating in one pass.
Contact coils have two power figures: pickup VA and holding VA, pickup being five to eight times holding. A CJX2-1810 draws about 70VA at pickup and 8VA holding. The decisive case is pickup: when several contactors close together the transformer must supply every pickup VA at once, or the secondary sags below the eighty-five percent pickup floor and coils hesitate or refuse. Holding duty is small and rarely the bottleneck. Timers, interposing relays and lamps add their sample-sheet figures, electronic timers two to five VA each, KAs one to three, LED lamps one to two.
The sizing expression runs S at least K times the summed pickup VA plus the summed holding VA plus other loads, with K the simultaneity factor. Simultaneous restart after an e-stop takes K equal to one, the worst case; staggered sequenced starts overlap barely at all since pickup lasts about a tenth of a second, so K of 0.3 to 0.5 fits. Worked example: five contactors with pickup VA of 50, 70, 90, 70 and 50, two timers at 8VA total, five KAs at 15VA, lamps at 8VA; simultaneous case needs about 380VA, take a 400VA transformer; staggered case about 180VA, take 250VA. Then check loading near eighty percent for margin, since a chronically full transformer ages fast.
After selection verify the voltage drop: transformer impedance drop plus cable drop must keep the pickup instant above eighty-five percent of rating. A remote button station one hundred meters away on 1.0mm² wire loses a few volts round trip, several percent on a 220V circuit, which stacks onto the transformer drop. Verify on site: with the panel dead, hand-close every contactor armature to simulate simultaneous pickup, energize, and watch for crisp pickups; monitor the secondary voltage at the closing instant, a dip beyond fifteen percent means the capacity is short. Track transformer temperature and secondary voltage quarterly; a downward voltage trend reveals added load or an ageing transformer.
| Load | Quantity | Pickup/running power | Sizing treatment |
|---|---|---|---|
| Contactor CJX2-18 | 3 units | 70VA / 8VA | Counted at simultaneous pickup |
| Contactor CJX2-32 | 2 units | 90VA / 10VA | Counted at simultaneous pickup |
| Electronic KT | 2 units | — / 4VA | Holding power only |
| Interposing KA | 5 units | — / 3VA | Holding power only |
| LED indicators | 8 units | — / 1.5VA | Running power only |
| Total | — | — | About 380VA at K=1, take 400VA |
Substitute your own loads and the example recomputes itself. The one decisive figure is pickup VA; holding VA is background. Choose the transformer for the worst simultaneous case, back it with the voltage-drop check, and finish with the hand-close simulation, and the rating will not be wrong.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Control transformer requirements refer to the GB/T 1094 series and the control supply clauses of GB/T 5226.1; contactor coil power data follow GB/T 14048.4 and maker sheets. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.