The strip drawing rules the cabinet holes, the cable schedule rules the outside cables; when the two disagree the subcontractor is lost. This page shows how to match them so every core is traceable at both ends.
The cable schedule lists one row per cable: number (W101), type and size (KVVRP-7×1.5), from-device, to-device, core assignment (core 1 to 24 V, core 2 to 0 V, shield to SE) and routing. On the strip drawing every incoming terminal is tagged with the cable number plus core, e.g. W101-3 at X1:12. The pair of cable number and core number is the key that links both documents.
Three matching rules: every core lands on one terminal hole tagged with cable number and core; core numbers agree word for word between the schedule and the drawing, with cores mapping to holes in order; spare cores also enter the schedule and the strip marked spare. The shield gets its own row with earthing method. Trap: changing the core assignment on the strip only leaves the two documents telling different stories.
| Cable W101 | Core | Hole |
|---|---|---|
| KVVRP-7×1.5 | 1 | X1:10 |
| To PLC cab | 2 | X1:11 |
| From console | 3 | X1:12 |
| Core 1 = 24 V | 4 | X1:13 |
| Core 2 = 0 V | 5 | X1:14 |
| Shield one end | SE | X1:SE1 |
One row per cable with number, size, ends, core assignment and shield earthing; every incoming hole tagged with cable number and core so both documents cross-check. Spares enter both, changes update both. Tick each core against the drawing, and test every core with the schedule at acceptance.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Documents per GB/T 6988, terminal marking per GB/T 4026. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.