The current rebounds and surges at the star-delta switch, burning contacts and stressing cables. This article explains that the surge comes from closing before opening or too short a dead band, then gives four suppression methods with field checks.
The surge comes from KM3 not opening before KM2 closes, or too short a dead band. With a wrong KT contact type the delta bridge connects while the star point is still live, and the winding back-emf stacks on the supply to produce a several-times inrush that stresses contacts and the upstream grid.
The time dead band and KT contact choice are key. Use an on-delay timer with a changeover contact that opens KM3 then closes KM2, giving a natural gap; an intermediate relay can add an electrical dead band. Confirm the timer is a delayed changeover type, not a simple contact, and prefer electronic for less jitter.
Four engineering fixes suppress the surge: guarantee break-before-make with a dead band, choose an electronic timer to cut jitter, add RC snubbers across contacts, or insert a starting reactor for large motors. Compare the peak current with a clamp meter before and after the change.
| Measure | Effect | Use | Note |
|---|---|---|---|
| Time dead band | separates contactors | all | use changeover |
| Electronic timer | less jitter | precision | cost higher |
| RC snubber | cuts spike | contact protect | wire right |
| Start reactor | limits surge | large motor | bulky |
| Soft start | smooth current | frequent | more wiring |
Rule: break-before-make with a dead band is first; the rest are aids. Use a clamp meter to watch the switch peak; a clear drop versus before is the pass criterion, do not pile on devices blindly. A too-long dead band also heats the motor, so balance it.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Contactors per IEC 60947-4-1, safety per IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.