Delay time is not by guess; star-delta waits for speed, sequence start waits for current peak, cooling waits for heat, each with its method. This note covers the setting calculation and method for these delays so timing is no longer by feel.
Star-delta swap delay: wait until the motor accelerates near rated speed before swapping, empirical 60 to 80 percent of start time, generally 3 to 10 seconds, larger for heavy load. Sequence start delay: wait until the previous inrush peak, about 3 to 7 times rated for 0.5 to 2 seconds, passes before next, 2 to 5 seconds. Cooling delay: wait until temperature or pressure falls safe, by thermal time constant 10 to 30 seconds. First set by formula and experience, then measure and fine-tune.
Set with the KT knob, dip or keys, coarse by scale then calibrate with a stopwatch because scale error often reaches twenty percent. Electronic KT sets digitally, high accuracy; air-dashpot adjusts gap by screw, lower accuracy needs more checks. Calibrate by simulating, stopwatch from coil energise or de-energise to contact action, repeat to the set value. Record each KT set and actual value for maintenance reproducibility. Errors: too short, star-delta swaps before speed, high current burns contact, sequence interval too short trips main; too long wastes power or machine will not stop; unit wrong seconds as minutes off by tens; scale only no measure far from nominal. Always stopwatch accept and log.
| Type | Method | Typical | Calibrate |
|---|---|---|---|
| Star-delta | 60-80% start | 3-10s | Stopwatch |
| Sequence | Past peak | 2-5s | Stopwatch |
| Cooling | Thermal | 10-30s | Temp |
| Set | Knob dip | Scale | Measure |
| Error | Short long | Unit | Avoid |
| Accept | Stopwatch | Log | Reproduce |
Set delay by physics: star-delta 60 to 80 percent start 3 to 10 s heavy large, sequence past peak 2 to 5 s, cooling thermal 10 to 30 s. After setting always stopwatch calibrate, scale error to twenty percent, log set value for reproducibility, avoid too short too long unit wrong.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Motor start and delay per GB/T 5226.1 and GB 755, IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.