A terminal drawing drawn but not checked means the costly rework shows up on site. This page covers what to check and the usual mistakes.
Checking step one is numbers: continuous, no duplicate, no gap, and cross-findable with the wiring wire numbers. Step two is connections: every terminal has a clear destination and cross-page links carry a continuation mark. Step three is marking: earth as PE, shield single-end grounded, jumpers drawn clearly. Any vague item stalls the site. Trap: admiring a tidy drawing but not the logic, then finding two holes share one number.
Six frequent errors: duplicate numbers, missing wire numbers, broken cross-page links, earth terminals mixed in, missing jumper drawings, and no spares. Check against this list tick by tick, then have a second person cross-review and sign before filing; it is ten times cheaper than rework. Use the EPLAN navigator to auto-find duplicates and missing links.
| Point | Check | Wrong |
|---|---|---|
| Number | No dup | Trace |
| Link | Has dest | Open |
| Mark | PE jumper | Miswire |
| Dup | Same no | Short |
| Cross | Continued | Miss |
| Review | Two | Omit |
Check that numbers are continuous and cross-findable, links have destinations and marking includes PE and jumpers. Watch six errors: duplicate numbers, missing wire numbers, broken cross-page, mixed earth, missing jumper, no spare. Tick the list, cross-review by two people, re-check after any change and let the navigator find duplicates.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical documentation per GB/T 6988, terminal marking per GB/T 4026. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.