Hand-numbering and printing hundreds of wires takes a day and still errors. EPLAN, AutoCAD Electrical or even Excel plus VBA can batch the job. Here is the approach and the traps.
Professional electrical CAD (EPLAN, AutoCAD Electrical, SOLIDWORKS Electrical) treats each connection as an object in the schematic and auto-assigns numbers by an addressing rule, then exports the number list and print files in one click. Even without pro CAD, you can build a wire-number ledger in Excel, build page-sequence with formulas, and use mail-merge or VBA to generate label text for the marker printer.
The flow: build project, draw connections, set addressing, auto-number, export list, check duplicates, batch print. Traps: rules not set, exported bands collide; export not checked, duplicates printed and fitted wrong; print template font not sized, text too small on the sleeve. Set rules first, always check after export, preview before print, pick marker material by environment, and verify a sample before volume.
| Stage | Do | Note |
|---|---|---|
| Tool | EPLAN/AE/Excel | Manage conn |
| Rule | Set addressing | No clash |
| Export | Number list | Check dup |
| Preview font | Material | |
| Verify | Dup and gap | Closed loop |
| Volume | Sample first | Then batch |
Rule: pro CAD manages connections and auto-numbers, or Excel ledger plus VBA batch-generates. Set rules first, always check duplicates after export, preview and size the font before print, pick material by site, verify a sample then volume. Never batch-print without checking.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Electrical CAD and documentation per GB/T 6988 series, graphical symbols per GB/T 4728, markings per GB/T 7947. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.