Too small a contactor burns contacts, too big wastes and is not always better. Matching rating to motor power and current is basic electrician work; here is a quick table for 380V motors.
Match by current first: a 380V three-phase motor draws about Ie = P / (1.732 × 0.38 × cosφ × η); at cosφ 0.85 and η 0.9 that is about 1.8A per kW. So 7.5kW ≈15A, 15kW ≈30A, 30kW ≈56A. Pick an AC-3 contactor with rated current ≥ Ie and 1.1~1.25x margin. A 15A motor takes an 18~25A contactor, heavy or frequent start adds more.
Rule-of-thumb pairs: 3kW→9A, 5.5kW→12A, 7.5kW→18A, 11kW→25A, 15kW→32A, 22kW→40A, 30kW→50A, 37kW→65A, 45kW→80A. This is AC-3 continuous; AC-4 inching or plugging needs one or two steps up. Also confirm coil voltage, pole count (three) and duty category, not just current.
Pit one: sizing the contactor right at Ie with no margin, start and swing keep it at full load and contacts age early. Pit two: an AC-3 contactor on AC-4 frequent inching breaks locked-rotor current and wears fast. Pit three: reading power but not voltage, a 660V motor of same power draws less current but needs different insulation. Size by Ie times margin, confirm duty and coil voltage.
| Motor power | Current ≈ | Contactor |
|---|---|---|
| 3kW | 6.5A | 9A |
| 5.5kW | 11A | 12A |
| 7.5kW | 15A | 18A |
| 11kW | 22A | 25A |
| 15kW | 30A | 32A |
| 22kW | 44A | 40A (50) |
| 30kW | 56A | 50A (65) |
| 37kW | 70A | 65A (80) |
Rule: about 1.8A per kW, pick contactor at Ie times 1.1~1.25 margin, AC-3 continuous, AC-4 step up. Confirm coil voltage and poles, heavy frequent start adds a step, never size right at rating.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Contactor selection and duty per GB/T 14048.4 (IEC 60947-4-1), motor parameters per GB/T 755, machine safety per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.