Insulation is the lifeline of a motor, and moisture, aging and carbon dust all show up on a megger before anything else. The measurement method, acceptance criteria, absorption ratio and withstand test procedure belong in every maintenance notebook.
Pick the megger voltage by winding rating: 500V instruments below 500V machines, 1000V for 500V to 3000V, 2500V above. Discharge the armature thoroughly before and after, since large windings store charge. Read after 60 seconds and log temperature, because resistance roughly doubles for every 10C drop and criteria only compare at equal temperature. The hot acceptance rule is R at 75C of at least Un divided by (1000 plus Pn/100) megohms with a 0.5 megohm floor, and low-voltage machines at room temperature should reach at least 1 megohm before energizing.
The absorption ratio K = R60/R15 distinguishes dry from damp insulation: 1.3 or better is healthy, 1.0 to 1.3 is suspect, and large machines use the polarization index with 2.0 as the good mark. Contamination versus moisture has a signature: carbon dust lowers resistance with a normal ratio and responds to cleaning, while moisture drops both and demands drying at 5 to 8C per hour with windings under 90C. The withstand test, 2Un plus 1000V for one minute after new installation or major overhaul and 0.75 times after repair, comes only after insulation resistance passes, never before.
| Test | Method and voltage | Pass criterion | If failed |
|---|---|---|---|
| hot insulation resistance | megger 60s reading | Un/(1000+Pn/100) MΩ, floor 0.5MΩ | dry or clean dust |
| cold insulation resistance | 500~2500V by rating | at least 1MΩ for LV machines | log and convert temperature |
| absorption ratio K | R60/R15 | K at least 1.3 | dry if between 1.0 and 1.3 |
| polarization index PI | R10min/R1min | PI at least 2 (large machines) | stop and inspect below 1.5 |
| AC withstand | 2Un+1000V for 1min | no breakdown or flashover | locate and repair the fault |
| post-repair withstand | 0.75x test voltage | no breakdown or flashover | dry again and retest |
Work in pairs, one cranking and one guarding the leads, and always discharge before disconnecting: the capacitive residual voltage on a large armature can injure. Trend the readings seasonally, since three quarters of steady decline means schedule a drying.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: See GB/T 755 (IEC 60034-1) and GB/T 1311 (DC machine test methods) for insulation and withstand requirements. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.