An earth resistance number is only as good as the electrode layout. This page walks the three pole fall of potential method, the standard spacings, and the acceptance values for each kind of installation.
The three pole method needs the tester, the electrode under test, and two auxiliary spikes in a straight line: the current spike at distance C and the potential spike at P, commonly 20 m and 40 m out for a single rod. Connect the E lead to the earthing conductor, disconnect the equipment side first so parallel paths do not fake a low reading, drive the spikes fully, and keep the line clear of buried pipes and cables that shunt the test current.
Measure at least twice with the potential spike moved a few meters either side; stable readings within 5 percent confirm the flat part of the curve. Acceptance depends on the object: 4 ohms or less for low voltage equipment earths and transformer neutrals, 10 ohms for lightning protection and repeated earthing of the neutral, and for TT systems the value must satisfy R times body current logic, practically under 50 divided by the RCD operating current. Seasonal moisture swings readings by a factor of two or more, so test in the worst dry season where possible and log every result with the weather.
| Object under test | Acceptance value | Spike spacing |
|---|---|---|
| Low voltage equipment earth | 4 ohms or less | 20/40m |
| TT system with RCD | Under 50/Ia ohms | 20/40m |
| Lightning protection earth | 10 ohms or less | Enlarged per grid |
| Transformer neutral earth | 4 ohms or less | Enlarged per grid |
| Repeated neutral earthing | 10 ohms or less | At line ends |
Lay the three spikes in a straight line, disconnect the installation before testing, and accept 4 ohms for equipment earths, 10 ohms for lightning protection. Test in the dry season and log results.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Earthing installations follow GB 50169 and GB/T 21431, system earthing GB/T 14050, with test methods per IEC 61557. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.