When a motor burns the biggest fear is losing the original data so rewound turns and wire size go wrong and performance changes. This page gives the standard rewind steps and the must record list before stripping.
Before stripping the old winding you must record ideally with photos and sketch: 1 connection Y or delta and parallel branch a; 2 pitch y spanning slots; 3 turns per coil; 4 wire diameter; 5 slot and pole count; 6 insulation class; 7 nameplate. Missing any one forces guesswork.
Steps: 1 record; 2 heat to soften insulation and pull old wire keeping one complete coil as template; 3 clean slot fit new insulation; 4 wind and embed per original; 5 connect; 6 vacuum impregnate and bake; 7 measure three phase resistance balance insulation megger and no load current. Pit one fewer turns raises flux density and no load current; pit two thinner wire overheats.
| Must record | Content | Wrong result | Check |
|---|---|---|---|
| Conn branch | Y delta a | perf off | resistance |
| Pitch | span y | torque loss | compare |
| Turns | per coil | flux current | count |
| Wire | diameter | heat | micrometer |
| Slots poles | Z 2p | wrong | count |
| Insulate | class | overheat | megger |
Record connection pitch turns wire diameter slot pole count insulation and nameplate before stripping and keep one coil as template; wind and connect exactly as original then vacuum impregnate. After finishing measure three phase resistance balance and insulation before power on.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Rotating machine rewind see IEC 60034-1 and electrical safety see GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.