MOULDLKnowledge BaseElectrical Knowledge Base3D Model DownloadsMembership
中文版Model Store »
Knowledge Base › Electrical Knowledge Base › How to achieve up/down breaker selectivity
HomeModels
Table of contents

On this page

Electrical & Electronic Basics (600 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

How to achieve up/down breaker selectivity

A panel has a dozen breakers; how to trip only the nearest on fault instead of the whole floor? This page gives three selectivity methods.

1. How it works

Selectivity means the nearest breaker clears the fault while the upstream stays, shrinking the outage. Full selectivity keeps the upstream from tripping within a stated current; partial only over part of the range. It is achieved by current grading (upstream In larger), time grading (upstream delayed longer) or energy limitation (current-limiting upstream keeps fault low so downstream trips first).

2. Numbers and practice

Method one, current/time grading: most common, upstream In ≥1.6× downstream and upstream uses long delay or higher instant threshold so on downstream short the upstream has not reached trip. Example downstream C16 (instant 80~160 A), upstream C40 (200~400 A) with short delay ensures only the 16 A branch clears. Bus tie and incoming use selective breakers (ZSI) to clear only the faulted section.

3. Pitfalls and fixes

Method two, current-limiting and energy coordination: a limiting breaker restricts prospective fault current low (e.g. 20 kA to 5 kA) at the instant, so energy through downstream is below its trip need and downstream trips first; check the maker energy table. Method three, electronic ZSI (Zone Selective Interlock) communicates up/down so the downstream fault makes upstream delay, giving full selectivity fast. Traps: close In, no curve check, wrong limiting pair all cause non-selective total trip.

4. Selectivity methods

MethodPrinciplePoint
CurrentUp≥1.6×downCommon
TimeUp delayedShort delay
LimitingUp limits, down firstEnergy table
ZSIComms interlockFull fast
CheckCurve/energyAvoid miss

5. Notes

Selectivity uses current grading (upstream In≥1.6×), time grading (upstream delayed) or limiting/energy and ZSI comms, tripping only the nearest. Traditional uses current plus short delay; incoming uses selective breakers. Overlay curves or energy tables or you get non-selective trips.

6. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Switchgear per GB/T 14048.2; selectivity per GB/T 50054. Always check the device datasheet and the product design file for ratings and derating.

7. Cautions

⚠️ Three common pitfalls:
① Close In causes both to trip on fault
② No curve check fails coordination
③ Wrong limiting pair is non-selective

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.