MOULDLKnowledge BaseElectrical Knowledge Base3D Model DownloadsMembership
中文版Model Store »
Knowledge Base › Electrical Knowledge Base › Impact of frequent motor starting on the supply network
HomeModels
Table of contents

On this page

Electrical & Electronic Basics (600 articles)

Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Impact of frequent motor starting on the supply network

A large motor starting direct-on-line drags the bus voltage down and can trip every other device on the same transformer. This page shows how to estimate the voltage dip and when a soft starter or VFD is mandatory.

1. How it works

Starting draws 5 to 7 times current that, across the transformer and cable impedance, produces a dip roughly Delta U percent equals starting apparent power divided by short-circuit plus transformer capacity. A 75 kW motor direct-on-line can pull a 400 V bus down to 340 V, a 15 percent drop that trips PLCs, contactors and VFDs on the same feeder. Codes usually cap the dip at 15 percent, or 10 percent for frequent starts.

2. Practice and pitfalls

If the estimate exceeds the limit, cut the starting current: star-delta drops it to about one third, an autotransformer at 65 or 80 percent tap gives 2.8 times, a soft starter holds 3 to 4 times, and a VFD holds 1 to 1.5 times. Stagger multiple large starts by over 30 seconds and give sensitive loads their own feeder. Frequent starting also fatigues the transformer winding through repeated thermal and mechanical stress.

3. Voltage dip of different starting methods vs grid impact

Starting methodCurrent multipleVoltage dipWhere used
DOL start5~7xLargestSmall motors <10 kW
Star-delta1.7~2xMediumDelta-wound motors
Autotransformer 65%2.8xSmallerMedium and large
Soft starter3~4xControllableGeneral
VFD1~1.5xSmallestSpeed control needed

4. Notes

Before starting a large motor calculate the busbar dip; above 15% a reduced-voltage method is mandatory. Stagger starts on the same transformer by 30 s or more and feed sensitive loads from separate circuits. Shops with frequent starts should move to soft starters or VFDs, which protect both the grid and the motor.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Supply voltage deviation limits: GB/T 12325; starting impact reference: GB/T 5226.1 / IEC 60204-1. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Starting a big motor DOL without a dip study drops the busbar over 15% and trips every PLC on the floor
② Starting several large motors together stacks the dips and overloads the transformer
③ Picking the wrong soft-starter tap leaves the current limiting too weak and the dip still breaches the threshold

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.

Related reading

Related 3D models: Ready to build it? Download free 3D models & CAD drawings at MOULDL »
MOULDL · Electrical Knowledge Base · free self-study reference for electrical & automation engineers, 3D CAD models at MOULDL