A megger tells you whether a motor winding is sound, but the right range, hookup and pass criterion matter. This page covers megger selection, wiring and the acceptance rules including absorption ratio so you stop guessing insulation by feel.
Use a megger, not a multimeter high ohm range whose voltage is too low to be meaningful. For low voltage motors up to 500 V pick the 500 V range, for high voltage use 1000 or 2500 V. De energize, discharge and disconnect external leads, short the three phases for a ground test then test phase to phase separately. Crank at about 120 r/min steadily and read after stabilization. Damp or dirty surfaces read falsely low, so clean and dry before judging.
Acceptance: low voltage windings are generally not below 0.5 MΩ, many plants require 1 MΩ or more, and the rule of thumb is at least 1 MΩ per kilovolt of working voltage. More telling is the absorption ratio K equals R60 over R15; sound insulation gives K at least 1.3 while damp or aged insulation approaches 1. High voltage machines also want polarization index PI equals R10min over R1min at least 2. After rebuild, cold insulation far exceeds hot; hot below 0.5 MΩ must be investigated. Trend the readings over time, which beats a single absolute value. Always discharge first, especially on drives and long cable, test phase to phase too, dry before scrapping, and run the overvoltage test only after insulation passes, every 6 to 12 months or 2000 hours.
| Item | Method or standard | Criterion |
|---|---|---|
| LV ground | 500 V megger | 0.5 MΩ min, 1 MΩ plant |
| HV ground | 1000 to 2500 V megger | 1 MΩ per kV |
| absorption K | R60 over R15 | 1.3 or above good |
| polarization PI | R10min over R1min | 2 or above good |
| phase to phase | per phase | same as ground |
Pick the megger range by voltage, de energize discharge and clean before testing, pass on 0.5 MΩ floor and absorption ratio 1.3 or polarization index 2 for high voltage. Trend readings over time, test phase to phase, dry before scrapping and only overvoltage test after a good insulation result, on a 6 to 12 month or 2000 hour cycle.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Test and insulation per GB/T 1032 and GB/T 755 (IEC 60034-1); insulation test per GB/T 14711. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.