Turn to turn short is the most hidden fault: no external sign yet no load current high heat and torque drop. This page explains practical detection methods usable without a full lab.
A turn to turn short is insulation breakdown between adjacent turns of the same coil so part of the coil is shorted. Result: that phase effective turns reduce inductance drops and current rises while three phase becomes unbalanced and the motor heats and loses torque with no visible damage.
Method one no load current: run the motor uncoupled and measure three phase current with a clamp meter; a shorted phase draws clearly higher current with imbalance above 5 to 10 percent plus buzz and heat. Method two DC resistance is too insensitive for early shorts. Method three a surge comparison tester shows differing waveforms between phases which is the most reliable. Pit: a megger only checks ground not turns so do not trust it alone.
| Method | Equipment | Sensitivity | Field use |
|---|---|---|---|
| No load current | clamp meter | medium | most common |
| DC resistance | bridge | low | late only |
| Surge test | surge tester | high | best |
| Megger | insulation | none for turns | ground only |
| Sound heat | ear hand | clue | screening |
| Confirm | surge compare | waveform | final |
A megger cannot find turn shorts because it only checks ground; use three phase no load current imbalance above 10 percent with buzz and heat for first screen then confirm with a surge comparison tester showing differing waveforms. Never trust insulation alone.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Rotating machine test see IEC 60034-1 and diagnosis see IEC 60034-3. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.