A grounded motor means the winding touches the frame; energising it without checks trips the breaker or shocks someone. This page uses a megger to locate the faulted phase and walks from terminal box to winding.
First de-energise, discharge and remove the supply and star point, then megger each phase to frame with a 500 V instrument for low-voltage motors. Healthy insulation exceeds 1 M ohm, below 0.5 M ohm is a ground fault. If all three are low the motor is damp; if only one phase is low that phase or its lead is damaged. Spin the megger near 120 r/min and read the steady value.
Open the terminal box and break the star or delta connection, then megger each phase alone. A still-low phase points inside the winding; if all read fine after separation the fault is external lead or dirty board. Inspect for carbon tracking, gnawed cable and metal debris. Pure dampness is dried with lamps or a low-voltage short-circuit heat method until over 1 M ohm; charred, melted turns must be rewound. After repair do a 2U plus 1000 V withstand test.
| Step | Operation | Criterion | Conclusion |
|---|---|---|---|
| 1 Megger test | Phase to frame | >1 Mohm | Normal |
| 2 Low value | <0.5 Mohm | Short to earth | Find cause |
| 3 Split | Open star point | One phase low | Inside winding |
| 4 Check externals | Inspect leads | External low | Terminal box |
| 5 Repair | Dry or rewind | Recovered | Re-test |
Diagnose an earth fault by megger first to identify the phase, then open the star point to localise whether the fault is inside the winding or in the external leads. Damp insulation can simply be dried out; charred, melted turns must be rewound. Run a withstand test after repair, and treat taped-up repairs as emergency only, never permanent.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Insulation testing of rotating machines: GB/T 755 / IEC 60034-1; insulation resistance measurement: GB/T 1032. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.