Three-phase and single-phase meters wire very differently; wrong wiring loses billing or burns the meter. This page covers both structures, CT use and common connections.
A single-phase meter has four terminals: line in, line out, neutral in, neutral out, with the current coil in the line and voltage across line-neutral, load on the out side. A direct small meter wires straight; large current uses a CT to step down. Reversing line-neutral or the current direction makes it run backward or stop.
A three-phase three-wire meter, two elements, fits no neutral and uses two line currents with two line voltages, the two-wattmeter method. A three-phase four-wire meter, three elements, uses three line currents and three phase-to-neutral voltages, the three-wattmeter method, and handles unbalance. Large current always goes through a CT whose secondary must never open and whose S1 S2 polarity must not reverse.
| Item | Single | 3-phase |
|---|---|---|
| Terminals | L/N in-out | 3 elem to N |
| Current | in line | CT each |
| Voltage | L-N | phase to N |
| CT | big current | no open |
| Polarity | in-out | S1/S2 |
| Verify | forward | phase meter |
Identify single or three phase, how many elements and whether CT before wiring. Never open a CT secondary, keep S1 in S2 out. After wiring use a phase-voltage meter to confirm phase and that active power runs forward. When billing looks wrong, check wiring and CT ratio before blaming the meter, and leave test ports for periodic checks.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Energy metering follows GB/T 17215 and installation GB/T 50063. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.