kW, kvar and kVA get mixed up daily - and the mix-up costs cable area, transformer size and penalty fees. This page draws the power triangle and works a real compensation example.
Apparent power S = UI in kVA is what cables and transformers must carry; active power P = UIcosφ in kW does the work and runs the meter; reactive power Q = UIsinφ in kvar shuttles between source and load to build magnetic fields. They form a right triangle, S² = P² + Q², and the utility bills penalties below 0.9 power factor.
Example: a 380V 10kW motor at cosφ = 0.86 draws S = 11.6kVA, I ≈ 17.7A. Let the power factor sag to 0.7 and the same 10kW needs 14.3kVA and 21.7A - 50 percent more line loss from I²R. Compensation: Qc = P×(tanφ1 − tanφ2), so 10kW from 0.86 to 0.95 needs about 2.6kvar. Size everything - cables, transformers, breakers - in kVA, never kW. Local compensation follows 90 percent of the motor magnetizing reactive power; overcompensation raises voltage, and harmonic-rich boards need detuned reactors or the cans cook.
| Quantity | Unit | Formula | Governs |
|---|---|---|---|
| Apparent S | kVA | S = √3 × U × I | Cable, transformer, breaker sizing |
| Active P | kW | P = S × cosφ | Real work, energy metering |
| Reactive Q | kvar | Q = S × sinφ | Magnetization, compensation |
| Power factor | None | cosφ = P/S | Utility penalty below 0.9 |
| Compensation Qc | kvar | P × (tanφ1−tanφ2) | 2.6kvar for 10kW to 0.95 |
| Local cap sizing | kvar | 0.9 × magnetizing Q | Prevents self-excitation |
Practice: when plant power factor sags below 0.9, audit lightly loaded large motors first - they are the reactive hogs. Bulging compensation cans point to harmonics; detuning reactors beat can-swapping. Every capacity decision is billed in kVA.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Power quality requirements per GB/T 15543 and GB/T 12325; reactive compensation per GB/T 15576. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.