Quick Reference

  • PLC & Programming
  • Electrical & Electronic Basics (monthly)(每月更新中)
  • Electrical Control & Drawings (monthly)(每月更新中)
  • Drives & Actuators (monthly)(每月更新中)
  • Sensors & Detection (monthly)(每月更新中)
  • Industrial Communication & Networks (monthly)(每月更新中)
  • HMI & Host Systems (monthly)(每月更新中)
  • Industrial Robots & Motion Control (monthly)(每月更新中)
  • Mechatronic System Integration (monthly)(每月更新中)
  • Fault Diagnosis & Standards (monthly)(每月更新中)

Peak vs average power: what motor starting does to your sizing

Sizing a generator on average power leaves it unable to start a motor; sizing a breaker on running current means a trip at every start. This page puts numbers on the starting surge.

1. How it works

Average power is what the energy meter bills; peak power decides whether equipment survives and whether protection nuisance-trips. A motor is the extreme case: direct-on-line starting draws 6 to 7 times rated current at a power factor of 0.3 to 0.4, so apparent power peaks 4 to 5 times steady state. A 7.5kW motor jumps from about 9kVA running to roughly 66kVA at start - for half a second to a few seconds, but every generator, UPS, breaker and cable must live through it.

2. Practice and pitfalls

Sizing rules: generators need 2.5 to 3 times motor rating or the voltage dip releases the contactors; UPS units need industrial overload ratings or generous oversizing; breakers need the D-curve (10 to 20 times) for motor circuits since a C-curve sits on the edge of the inrush; long cables need a voltage-drop check because dips beyond 15 percent make contactors chatter. Cures: VFD starting cuts current to 1.5 times and halves generator sizing; soft starters limit to 2 to 4 times; stagger multiple large motors 5 to 10 seconds apart.

3. Starting surge and sizing margin quick table

Starting methodCurrent multiplePeak S vs runningRequirements
Direct on line6~7xAbout 4~5x3x generator, D-curve breaker
Star-delta2~2.5xAbout 2xMind the torque
Autotransformer3~4xAbout 2.5xClassic for large motors
Soft starter2~4x adjustableAbout 1.5~2xBypass contactor needed
VFD1~1.5xAbout 1.2xBest sizing, highest cost
Sequential startsOne at a timeSize on the largest5~10s stagger logic

4. Notes

Checklist: generators at three times motor load, UPS margin per starting method, breaker instantaneous 20 percent above the inrush peak, and a voltage-drop check on long runs. If the peak is not covered, the average is irrelevant.

5. References

The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: Motor starting performance per GB/T 755; breaker trip characteristics per GB/T 14048.2; plant supply per GB/T 5226.1. Always check the device datasheet and the product design file for ratings and derating.

6. Cautions

⚠️ Three common pitfalls:
① Generator sized on average power:the start dips the bus and contactors drop out
② A C-curve breaker on a hard-starting motor:instantaneous sits on the inrush, trips constantly
③ Several large motors starting together:stacked peaks take down the main switch

Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.