Why must the PE bar never share terminals with the N bar? This page separates protective from system earthing, shows proper equipotential bonding practice, and lists the checks that keep it honest.
Protective earthing (PE) bonds enclosures, cabinets and cable trays so a fault drives enough current to trip protection while limiting touch voltage; system earthing (N) grounds the transformer neutral for voltage stability and single-phase supply. They serve different purposes and meet at one point only, the transformer neutral in a TN-S system. Bonding them inside a board creates stray currents along PE that trip RCDs and upset electronics. Doors and moving parts need braided copper jumpers, at least 2.5 mm² or sized for the current, never conduction through hinges.
Equipotential bonding ties the PE bar, steelwork, trays, pipes and cable sheaths together to eliminate potential differences. Main boards carry an MEB, final boxes a LEB. Conductors are copper, main bonding at least 6 mm² where mechanically protected and 16 mm² otherwise, terminated with compression lugs and washers, never wrapped; trays are bonded at two points per section with paint removed to bare metal. Earth resistance targets around 4 ohms for the neutral earth of TN systems above 100 kVA, relaxed to 10 ohms below, while bonding is judged by continuity rather than resistance.
Annual checks: continuity from any enclosure to the PE bar under 0.2 ohms, earth resistance by the three-pole method, and spot checks of tray jumpers. Typical defects include broken door braids, rusted PE bolts, double-ended shield earthing causing circulating currents, and painted-through connector plates. Earthing faults stay silent until a fault arrives, so a concentrated inspection season is the only dependable control.
| Item | Method | Pass criterion | Remedy |
|---|---|---|---|
| Continuity | Micro-ohmmeter to PE bar | Under 0.2 Ω | Re-torque or add jumper |
| Earth resistance | Three-pole tester | About 4 Ω per system | Drive more electrodes |
| Door bonding | Visual plus continuity | Braid intact | New braid |
| Tray jumpers | Sample plates | Good continuity | Strip paint, re-clamp |
| PE-N separation | Inspect terminals | Single point only | Re-wire |
| Shield earthing | Check both ends | Per design | Correct per rule |
Test continuity at acceptance with records, measure earth resistance before every rainy season, and restore bonding after any cabinet modification so the cut tray section never becomes the one missing link.
The quantities and component characteristics discussed here follow current national standards and the corresponding IEC documents: See GB/T 16895.3 and GB/T 5226.1 for earthing arrangements and protective conductors. Always check the device datasheet and the product design file for ratings and derating.
Locate the issue with the approach above, then confirm with measurements; safety-related circuits must follow the standards and manufacturer requirements.